4.标准操作说明书手册-Critical-point-dryer-v6

4.标准操作说明书手册-Critical-point-dryer-v6新质力文库-办公文档-行业资料-建筑施工-教育学习-标准规范-工作总结-资料下载新质力文库
4.标准操作说明书手册-Critical-point-dryer-v6
此内容为付费资源,请付费后查看
1722
立即购买
您当前未登录!建议登陆后购买,可保存购买订单
付费资源

第1页 / 共3页

第2页 / 共3页
试读已结束,还剩1页,您可下载完整版后进行离线阅读
© 版权声明
THE END
Guangdong TechnionThe Life Sciences and Bia-Engineeringsrael institute of TechnologyCore Facility广麻以色列理工学院Operating Instructions-Critical Point DryerManufacturer:TousimisModel:Autosamdri-931 wSafety:CO2 at high pressure(800 psi/55 atm).Pay attention to loose connections or strange sounds.、Inform the Core Facility staff for any safety issue or misuse of the instrument.Contact Information:Koby Gvili (E-mail:yaacov.gvili@gtiit.edu.cn)Ricardo CHEN (Phone Number:131-125-38546)1.Equipment and chemicals1)Ethanol:>99.5%purity.2)Beakers:100 ml and 250 ml3)Tweezers2.Turn on the machine for preheating1)Switch on the machine by pushing the POWER button up for 5 seconds.The lights above thePOWER button and inside the chamber should turn on.amari-PvI-5IPOWER OFFPOWER ON2)Make sure the 4 valves(COOL,FILL,BLEED,PURGE/VENT)are in their closed position (turnedall the way clockwise).⊕DECREASE0EC两EAsEtousimis加样=4年在Control board.The chamber is in the center.
喜欢就支持一下吧
点赞11 分享
评论 抢沙发

请登录后发表评论

    暂无评论内容