PPL-SU-1050

PPL-SU-1050新质力文库 - 聚焦新质生产力发展的数字化知识库_行业洞察 / 理论成果 / 实践指南免费下载新质力文库
PPL-SU-1050
此内容为付费资源,请付费后查看
1323
立即购买
您当前未登录!建议登陆后购买,可保存购买订单
付费资源

第1页 / 共56页

第2页 / 共56页
试读已结束,还剩54页,您可下载完整版后进行离线阅读
THE END
Integrity CriticalPPL-SU-1050-0.1Welded Line Pipe:Electric Welded and Submerged ArcWelded Line PipeOperating Environment:LNG,Onshore,Pipelines,Subsea,TopsidesThis document is the confidential property ofChevron U.S.A.Inc.and its affiliates.When made available toany contractor providing services to Chevron U.S.A.Inc.or its affiliates,the contractor's use of thisdocument shall be governed by the confidentiality provisions of the applicable contract or bid package.Without limiting the foregoing,neither the whole nor any part of this document may be disclosed by thecontractor to any third party,other than an affiliate of the contractor that requires this information forpurposes of the contract with the Chevron entity,without the prior written consent of the Chevron entitythat has disclosed this document to the contractor.When requested by Chevron U.S.A.Inc.or its disclosingaffiliate,the contractor must return all copies of this document to the Chevron entity requesting such returnand delete any electronic copies from the contractor's systems.Any and all modifications (changes,amendments,etc.)to this document must follow approvedChevron Engineering Standards governance processes.Rev.DateDescriptionAuthorTechnology LeaderL04/08General revision.Z.ChangS.Mishael(sponsor)M12/08General revision.Z.ChangS.Mishael(sponsor)N08/13General revision.A.GonzalezS.Mishael008/16General revision.K.BakerS.Mishael0.108/16Major Technical Modification:Updates to Section 4.3.1,K.BakerS.Mishaelitems 1 and 4:Section 6.3.item 1:Section 7.3,items 1and 2:and Table 16,item 11.August 20161988-2016 Chevron U.S.A.Inc.All rights reserved.Confidential-Restricted Access10f56
喜欢就支持一下吧
评论 抢沙发

请登录后发表评论

    请登录后查看评论内容