

第1页 / 共7页

第2页 / 共7页
试读已结束,还剩5页,您可下载完整版后进行离线阅读
THE END
Section 9-MaintenanceMarch 2025Seven Year MaintenanceThe following maintenance should be done every 7 years.1)Replace the Wire RopeMandatory wire ropes and sheaves replacement intervals are 7 years.Sheaves and wire rope must be replaced as sets.Mandatory wire rope and sheaves replacement must be carried out if anyone of the followedconditions exists,even if the interval between the replacements does not exceeds 7 years.Rusted or corroded wire ropes.·Kinked,“bird caged",or crushed ropes.Ropes at end of adjustment range.Sheaves failing wear out gage inspection.。Ropes with 6 total broken wires in one rope lay,3 in one strand in one rope lay,1 valleybreak,or 1 break at any end termination.Page 37135-RJ-Service Parts Manual-96909mec
请登录后查看评论内容