

第1页 / 共7页
试读已结束,还剩6页,您可下载完整版后进行离线阅读
THE END
第25卷增2岩石力学与工程学报Vol.25 Supp.22006年10月Chinese Journal of Rock Mechanics and Engineering0c1.,2006四个基坑加固工程案例分析付文光,张俊(治金工业部建筑研究总院深圳分院,广东深圳51054)摘要:基坑出现险情(或事故)是工程建设中常遇到案例。4个基坑在设计中分别采用复合土钉墙、双排管桩、放坡等不同支护结构,但均出现险情(或事故)。后查明,工程险情均为原设计存在缺陷所致,只是具体技术原因各不相同。针对不同情况采取不同的加固方案,均取得良好的处理效果。关德词:土力学:基坑:边坡稳定:锚杆:注浆:士石堤中图分类号:TU470:TV551.4文献标识码:A文章编号:1000-6915(2006)增2-3593-07ANALYSIS OF SLOPE INSTABILITY FOR FOUR FOUNDATION PITSFU Wenguang,ZHANG Jun(Shenzhen Branch,Central Research Institute of Building and Construction,Ministry of Metallurgical Industry,Shenzhen,Guangdong 518054,China)Abstract:The accidents of foundation pit in practical engineering are often found.Four cases of slope instabilityof foundation pits supported by composite soil-nailed wall,double-row piles and gentle-slope method areintroduced.The main reasons of slope instability for these cases are presented.Slope stabilization measures forthese cases are considered according to their different geologic conditions and surroundings around the foundationpits.The successful experiences of slope stabilization are achieved with practical engineerings.Key words:soil mechanics:foundation pit:slope stability:bolt:grouting:embankment(2)设计理论存在着欠缺,岩土工程处于半经引言验半理论状态,需要设计者根据自身经验对按理论计算出来的数据进行分析校核。基坑深度越来越深,工程地质条件及周边环境(3)设计方案有缺陷,可能是设计者的理论计越来越复杂,是工程建设所面临的问题。大多数基算错误或工程经验不足,也可能是建设单位等修改坑支护属于临时性工程,不能直接带来经济效益,原设计,也可能是设计条件发生变化后(如基坑局部往往不被建设单位等相关单位重视,投入到勘察、加深)没有及时进行设计变更等,这些因素导致设计设计、施工和监测等费用较少。种种主客观原因方案本身就有一定的欠缺或安全系数不足。导致基坑工程事故频发,出现险情更是寻常之事。(4)没有按图施工,这既有可能是施工单位的对基坑工程事故的统计结果四表明,基坑出现事故原因,也可能是建设单位及监理等单位的原因。或险情的原因是多样的,但主要集中在以下5个(⑤)施工中所用材料质量没有达到设计要求,方面:这些因素中又以设计、施工因素占主要部分。施工(1)地质勒察资料、对周边环境的调研等设计因素在工程中通过加强管理可解决,但设计方案如所需相关资料错误、缺失或不详。有缺陷,就为工程事故埋下隐患。收篇日期:2006-05-18:棒回日期:2006-07-07作筒介:付文光(1970-),男,192年毕业于北京钢铁学院,现任高级工程师、注册土木(岩土)工程师,主要从事岩土工程设计咨询、工程实线、试验研究等方面的工作。E-nail:fudidi@na.comC 1994-2011 China Academic Journal Electronic Publishing House.All rights reserved.http://www.cnki.net
请登录后查看评论内容