EISH_标准安装操作说明书手册

EISH_标准安装操作说明书手册新质力文库-办公文档-行业资料-建筑施工-教育学习-标准规范-工作总结-资料下载新质力文库
EISH_标准安装操作说明书手册
此内容为付费资源,请付费后查看
1424
立即购买
您当前未登录!建议登陆后购买,可保存购买订单
付费资源

第1页 / 共2页
试读已结束,还剩1页,您可下载完整版后进行离线阅读
THE END
AC current monitoring relayInstallation instructionsScan to read me in your language!Escanea para leerme en tu idioma!Scannen Sie,um mich in Ihrer Sprache zu Scansiona per leggermi nella tua lingua!目SHT四例alesen!Scan for at laese mig pa dit sprog!CA10AA7可wwwg avard auam on.comScanne pour me lire dans ta langue!扫码后选择相关语言进行阅读!ConnectionsComect terminals 1 and 2 in series with theConnection in case of low currentload.To measure currents below the nominal range draw the conductor throught the hole multile times.Draw the metered wre throught the central hole(Example with EISH200MA024:if the conductor is drawn through the central hole 5 times,the actual(one or several times.setpoint is 40 mA instead of 200 mA).Keep power OFF while connecting!EISHTerminalsTightening torqueLOAD1,2Sold state outputach terminal can accept up to 2 x 1.5 mm wiresAdjustmentLet the cunent flow through the conductor.The setpoint is foxed.When the current is higher than setpoint the output doses,when the cunent is lower than the setpoint the output opens.MountingPackagingCE-marking and approvalsHang the device to the DIN-Rai being sure that The packing materisl shoud be kept for redeliv-the spring dloses,or to the panel by screws.Use ery in case ol replacement or repair.C∈cIus①aBosa screwdriver to remove the peoduct.
喜欢就支持一下吧
评论 抢沙发

请登录后发表评论

    请登录后查看评论内容