ENGLISHGetting Started with Easy Altivar ATV610EAV6437406①Download The ManualsYou must have detailed information to be able to carry out the installation andcommissioning.This information can be found in the following manuals thatcan be downloaded on www.se.comVerify the Keyor scan the QR code in front of the Drive.2▣Points of yourThe ATV610 Installation manual (EAV64381)installation,The ATV610 Programming manual (EAV64387)identifiedThe Getting Started manual does not replace the Installationby this symbol.and the Programming manuals.AA DANGERHAZARD OF ELECTRIC SHOCK,EXPLOSION,OR ARC FLASHOnly appropriately trained persons who are familiar with and understand the contents of this manual and all other pertinent product documentation and whohave received safety training to recognize and avoid hazards involved are authorized to work on and with this drive system.Installation,adjustment,repair andmaintenance must be performed by qualified personnel.The system integrator is responsible for compliance with all local and national electrical code requirements as well as all other applicable regulations withrespect to grounding of all equipment.Many components of the product,including the printed circuit boards,operate with mains voltage.Only use properly rated,electrically insulated tools and measuring equipment.Do not touch unshielded components or terminals with voltage present..Motors can generate voltage when the shaft is rotated.Prior to performing any type of work on the drive system,block the motor shaft to prevent rotation.AC voltage can couple voltage to unused conductors in the motor cable.Insulate both ends of unused conductors of the motor cable.Do not short across the DC bus terminals or the DC bus capacitors or the braking resistor terminals.Before performing work on the drive system:Dis connect all power,including external control power that may be present.Take into account that the circuit breaker or main switch does not de-energizeall circuits.Place a Do Not Tum On label on all power switches related to the drive systemLock all power switches in the open position.Wait 15 minutes to allow the DC bus capacitors to discharge.Follow the instructions given in the chapter "Verifying the Absence of Voltage"in the installation manual of the productBefore applying voltage to the drive system:Verify that the work has been completed and that the entire installation cannot cause hazards.If the mains input terminals and the motor output terminals have been grounded and short-circuited,remove the ground and the shortcircuits on the mainsinput terminals and the motor output terminals.Verify proper grounding of all equipment..Verify that all protective equipment such as covers,doors,grids is installed andor closed.Failure to follow these instructions will result in death or serious injury.Electrical equipment should be installed,operated,serviced,and maintained only by qualified personnel.No responsibility is assumed by Schneider Electric for aryconsequ
请登录后查看评论内容