PMC-230简明操作说明书手册(20191017)

PMC-230简明操作说明书手册(20191017)新质力文库 - 聚焦新质生产力发展的数字化知识库_行业洞察 / 理论成果 / 实践指南免费下载新质力文库
PMC-230简明操作说明书手册(20191017)
此内容为付费资源,请付费后查看
1725
立即购买
您当前未登录!建议登陆后购买,可保存购买订单
付费资源

第1页 / 共2页
试读已结束,还剩1页,您可下载完整版后进行离线阅读
THE END
PMC-230 Quick Start GuideVersion 1.0Package Contents·PMC-230 Meter.Quick Start Guide (This document)Overview11RS-485(D+,D-)2--52Pulse Output (E+,E-)PMC-230LModel:PMC-230-BC35AE15060102433 LCD DisplayUn:95-240VAC,CAT IIIEETIb (Imax]:5(63)A64L,N from Source0/60H00015/kWhDigital Inputs (DIC,DI1,DI2,DI3)X/XX/XX8For Indoor Use Only96 LED Pulse Output1Relay Status LEDaccordance with local and national electrical codes.■■108,9 Buttons10 L',N'to LoadFront ViewSerial Number LabelLCD DisplayThe meter's Front Panel is used for both display and configuration purposes.The LCD display and the two buttonsprovide access to measurements,meter information and setup configuration.↓tT8-⑧COMImport/Export IndicatorPresent TariffComm.IndicatorMeasurementKVAh kvarh kWhUnitsLCD DisplayLCD SymbolsThe following figure shows the LCD display symbols based on "8"Rab。【ed。fefe6ehni,kxl。P,9。r.Ss「,u bw出y0.122324456.128.99LCD SymbolsMeter Installation Steps72The PMC-230 should be installed in a dry environment with no dustand kept away from heat,radiation and electrical noise sourceBefore installation,make sure that the DIN rail is already in placeMove the installation clip at the back of the PMC-230 downward tothe"unlock"position.Mount the PMC-230 on the DIN railPush the installation clip upward to the "lock"position to secure thePMC-230 on to the DIN RailMeter InstallationRevision Date:October 17,2019
喜欢就支持一下吧
评论 抢沙发

请登录后发表评论

    请登录后查看评论内容