PMC-350-C Quick Start GuideVersion 1.01Package Contentsa.PMC-350-C Meter with all plug-in connectors installedb.Factory Test Reportc.CD with PMC-350-C User Manuald.Quick Start Guide(this document)Meter Overview欧四EEE@9☒1LoRaWAN Antenna3xVoltage Input2Heart BeatPower SupplyLoRaWAN Network Connectionm■w口32xOptional DOLoRaWAN Wireless Data Activities41xOptional IRRS-485Activities54xOptional TCLeRSWINLCD Display63xCurrent InputButtons1×R5-485Port4xOptional DIPMC-350-C12L3W1801103096网1and cempetent perveond who have been freetly trained toV2(网21high voitape and current devices in accordance with lcal and nationalModel:PMC-350-CSCCT525BT7Eelectrical codes.V3V3 (TC11)3P5:95-250x,47-440,3W.0WC■VNVNTC1214Voltage:277V3~L-N,480V 3~L-L,CAT Il1 (Tc21)sAre to observe propeCurrent:40mA2112TC226Freq.:45-65h12121TC31722TC3218C@@回☒13131T419WI32I32(Tc424105N:1801103096DevEUl:0095690E000005D5Serial Number LabelWiring LabelWiring Label(1xIR+4xTC)Warning Label and SN DevEUI LabelUsing the Front Panel Buttons<7>Data Display ModeThe Default Display shows the kWh Import measurement under the Energy menu.Pressing this button scrollsthrough the available measurements in this menu.Before an item is selected,pressing this button scrolls to the next setup parameter.If the selected parameter is aSetup Configuration Modenumeric value,pressing this button increments the selected digit.If the selected parameter is an enumeratedvalue,pressing this button scrolls through the selection list.
Pressing this button for two seconds toggles between Data Display mode and Setup Configuration mode.Onceinside the Setup Configuration mode,pressing this button selects a parameter for modification.Once selected,theSetup Configuration Modeparameter value blinks while it's being changed.If the selected parameter is a numeric value,the cursor is at the right most digit by default.Pressing this buttonmoves the cursor one position to the left.If the cursor has reached the left most digit,pressing this button againwill save the current numeric value into memory.Mounting the MeterThe PMC-350-C should be installed in a dry environment with no dust andkept away from heat,radiation and electrical noise source.Before installation,make sure that the DIN Rail is already in placeMove the DIN Rail locking clip at the back of the PMC-350-Cdownward to the "unlock"positionAlign the top of the mounting channel at the back of the PMC-350-Cat an angle against the top of the DIN rail as shown in figure right35m72.Rotate the bottom of the PMC-350-C towards the back whileapplying a slight pressure to make sure that the device is completelyand securely fixed on to the DIN RailPush the DIN Rail locking clip upward to the "lock"position to securethe PMC-350-C on to the DIN RailRevision Date:June 29,2021
请登录后查看评论内容