

第1页 / 共2页
试读已结束,还剩1页,您可下载完整版后进行离线阅读
THE END
PMC-352-C Quick Start GuideVersion 1.1November 30,2023Package Contentsa.PMC-352-C Meter with all installation clips and plug-in connectors installedb.Factory Test Reportc.CD with PMC-352-C User Manuald.Quick Start Guide (this document)Meter OverviewPMC-3522a110g0PMC-352-CAJ2SANEP5:60264W=,47440t,2W,0mCumrent:40mA4565t①AC@a回Front ViewTop ViewBottom ViewSerial Number LabelWarning LabelIndicatorDescriptionTerminalDescriptionAL1,L2,L3Voltage Phase Active IndicatorGTC11,TC12,TC21,TC22,TC31,TC32,TC41,TC42NTC InputsRunDevice Running Status Indicator?DIC,DI1,DI2,DI3Digital Inputs。Infrared Communication PortD+,D-RS-485 PortsD。Antenna111,112,121,122,31,132Current InputsComm.Communication IndicatorV1,V2,V3,NVoltage InputsFAlarmAlarm/Energy Pulse IndicatorL/+,N/-(NC,NC for Self-Powered option)Power SupplyLED IndicatorIndicatorColorStatusDescriptionOnRegister 6040 is enabled and the corresponding Voltage Phase is activeL1/L2/L3GreenOffRegister 6040 is enabled and the corresponding Voltage Phase is inactiveAll OffRegister 6040 is disabledBlink once per secondDevice is running normallyRunGreenOffPower Off or Device is running abnormallyRedFlashingEnergy Pulsing is enabledAlarmOnEnergy Pulsing is disabled and at least one Setpoint is ActiveFlashingComm.GreenReceiving or transmitting data via RS-485 or LoRaOffNo CommunicationMounting the MeterBefore installation,make sure that the DIN Rail is already in place.Move the installation clip at the back of the PMC-352-C downward to the "unlock"positionAlign the top of the mounting channel at the back of the PMC-352-Cat an angle againstthe top of the DIN Rail as shown in figure rightRotate the bottom of the PMC-352-C towards the back while applying a slight pressureto make sure that the device is completely and securely fixed on to the DIN Rail.Push the installation clip upward to the "lock"position to secure the PMC-352-C on tothe DIN Rail65060wRevision Date:November 30,2023
请登录后查看评论内容