ChinaClassificationSociety(2012)Circ.No.34TotalNo.196-NoticeoftheimplementationofMEPC.205_62

ChinaClassificationSociety(2012)Circ.No.34TotalNo.196-NoticeoftheimplementationofMEPC.205_62新质力文库-办公文档-行业资料-建筑施工-教育学习-标准规范-工作总结-资料下载新质力文库
ChinaClassificationSociety(2012)Circ.No.34TotalNo.196-NoticeoftheimplementationofMEPC.205_62
此内容为付费资源,请付费后查看
1922
立即购买
您当前未登录!建议登陆后购买,可保存购买订单
付费资源

第1页 / 共16页
试读已结束,还剩15页,您可下载完整版后进行离线阅读
© 版权声明
THE END
CCSCircularChina Classification Society(2012)Circ.No.34Total No.196March 13,2012 total pages 1+15To relevant departments of CCS Headquarters,Shanghai Rules and Research Institute,planapproval centers,branches/offices,related shipyards,product manufacturers,testing organizations,design units,ship management companies and shipownersNotice of the Implementation of MEPC.205(62)1 BackgroundThe Marine Environment Protection Committee of the International Maritime Organization,at itssixty-second session on 15 July 2011,adopted resolution No.205 relating to 2011 GUIDELINESAND SPECIFICATIONS FOR ADD-ON EQUIPMENT FOR UPGRADING RESOLUTIONMEPC.60(33)-COMPLIANT OIL FILTERING EQUIPMENTThe guidelines apply to add-on post-treatment equipment for resolution MEPC.60(33)-compliantoil filtering equipment in order to improve their capabilities of treating emulsified oil so thatemulsion-breaking performance of oily bilge separators to be achieved by installation of add-onequipment could be equivalent to that of resolution MEPC.107(49)-compliant equipment.2 Instructions on implementation2.1 This guidelines is NOT mandatory requirements.2.2 This guidelines only apply to MEPC.60(33)-compliant oil filtering equipment.2.3 The production model of add-on equipment,for which the approval will apply,should be identical to the equipment,type-tested in accordance with the performanceand test specifications contained in the annex to the Guidelines.CCS will issue thecertificate in the format shown in the annex to the Guidelines.Attachment:Resolution MEPC.205(62):"2011 GUIDELINES AND SPECIFICATIONS FOR ADD-ONEQUIPMENT FOR UPGRADING RESOLUTION MEPC.60(33)-COMPLIANT OILFILTERING EQUIPMENTPlease feel free to contact Newbuildings Department of the Headquarters for any inquiryin the implementation by e-mail to:md@ccs.org.cn.The Circular is made public on CCS website(www.ccs.org.cn),and be transmitted to the relevant shipyards,shipowners,testing organizations,design units and product manufacturers by the branches within their responsible area.
喜欢就支持一下吧
点赞14 分享
评论 抢沙发

请登录后发表评论

    暂无评论内容