NoticeonimplementationofthecircularofMSC.1-Circ.1614andMSC.1-Circ.1618issuedbyIMO

NoticeonimplementationofthecircularofMSC.1-Circ.1614andMSC.1-Circ.1618issuedbyIMO新质力文库-办公文档-行业资料-建筑施工-教育学习-标准规范-工作总结-资料下载新质力文库
NoticeonimplementationofthecircularofMSC.1-Circ.1614andMSC.1-Circ.1618issuedbyIMO
此内容为付费资源,请付费后查看
1323
立即购买
您当前未登录!建议登陆后购买,可保存购买订单
付费资源

第1页 / 共11页

第2页 / 共11页
试读已结束,还剩9页,您可下载完整版后进行离线阅读
© 版权声明
THE END
CCSTechnical Information(2019)Technical Information No.40 Total No.434Dec.19,2019(Total 2 pages)To:Ship owners,Shipyards,Products Manufacturers and Designers,Relevant departments of CCSHeadquarters,CCS site surveyors,CCS plan approval centersNotice on the issuance of the IMO Circulars MSC.1/Circ.1614 andMSC.1/Circ.16181.PrefaceThe Maritime Safety Committee,at its 101 session (Jun 2019)approved thecircular of MSC.1/Circ.1614 "Interim Guidelines on Life-Saving Appliances andArrangements for Ships Operating in Polar Waters"and MSC.1/Circ.1618 "UnifiedInterpretations of SOLAS Chapter Ill".Il.Main technical points of MSC.1/Circ.1614As a consequential work related to the Polar Code,the interim guidelines on lifesavingappliances and arrangements for ships operating in polar waters were approved at thissession.This interim guidelines was developed to provide interim guidance outliningpossible means of mitigating hazards in order to comply with section 8.3 of part I-A(life-saving appliances and arrangements)of the International Code for Ships Operating inPolar Waters(Polar Code).Ill.Main technical points of MSC.1/Circ.1618Chapter lll/Regulation 20.11:The thorough examinations,overhauls and operationaltests,carried out at intervals of at least once every five years,should be done in thepresence of a surveyor.Chapter lll/Regulation 22.1.1/32.1.1:When considering the minimum number anddistribution of lifebuoys as required by regulations 22.1.1 or 32.1.1,as applicable,a lifebuoy,
喜欢就支持一下吧
点赞6 分享
评论 抢沙发

请登录后发表评论

    暂无评论内容