CCS_Circ.No.(2013)145_Total_No.431-Notice_on_the_implementation_of_the_amendment_to_SOLAS_Chapter_III_adopted_by_Resolution_MSC.338(91)

CCS_Circ.No.(2013)145_Total_No.431-Notice_on_the_implementation_of_the_amendment_to_SOLAS_Chapter_III_adopted_by_Resolution_MSC.338(91)新质力文库-办公文档-行业资料-建筑施工-教育学习-标准规范-工作总结-资料下载新质力文库
CCS_Circ.No.(2013)145_Total_No.431-Notice_on_the_implementation_of_the_amendment_to_SOLAS_Chapter_III_adopted_by_Resolution_MSC.338(91)
此内容为付费资源,请付费后查看
1722
立即购买
您当前未登录!建议登陆后购买,可保存购买订单
付费资源

第1页 / 共3页
试读已结束,还剩2页,您可下载完整版后进行离线阅读
© 版权声明
THE END
CCSCircularChina Classification Society(2013)Circ.No.145 Total No.431September 6.2013 (Total 3 Pages)To:Related departments of CCS Headquarters,CCS Shanghai Rules Research Institute,CCS Plan Approval Centers,CCS Branches and Offices;Related Shipyards,ShipDesigners,Shipping Companies,Marine Product ManufacturersNotice on the implementation of the amendment toSOLAS Chapter III adopted by Resolution MSC.338(91)The Maritime Safety Committee of IMO adopted the Resolution MSC.338(91)onthe amendments to the SOLAS,1974,as amended at its ninety-first session on 30 November2012.According to the tacit acceptance procedure,the said amendments shall be deemed tohave been accepted on 1 January 2014,and shall enter into force on 1 July 2014.According to the said amendment,new regulation 17-1 has been inserted in ChapterIII of SOLAS as amended.All ships are required by this new regulation to haveship-specific plans and procedures for recovery of persons from the water.Thisrequirement is mandatory.This circular gives instructions to the preparation for theimplementation of this requirement.Resolution MSC.338(91)including its annex attached.Instructions to the implementation1 Ships constructed (keel was laid or at a similar stage of construction)before 1July 2014,shall comply with this requirement by the first periodical or renewal safetyequipment survey of the ship to be carried out after 1 July 2014,whichever comes first.2 Ships constructed (keel was laid or at a similar stage of construction)on or after1 July 2014,shall comply with this requirement at the stage that the ship's building surveyclose to completion,at the latest not later than the issuance of the Safety EquipmentCertificate.
喜欢就支持一下吧
点赞10 分享
评论 抢沙发

请登录后发表评论

    暂无评论内容